Case Study — Custom Platform

One Platform. Every Service. A Multi-Vertical Marketplace Built in 45 Working Days

A marketplace and gateway platform unifying home services, ride-hailing, and food delivery under one account, one login, and one automatic commission system.

4.8 out of 5Google Rating
HEADLINE METRIC
45 days

working-day Phase 1 build

01
14+
Industry Verticals
02
4
User Roles & Dashboards
03
5
Subscription Tiers
04
20%
Automatic Commission
INDUSTRY
Marketplace Platform
TIMELINE
45 working days (Phase 1 MVP, 2026)
RESULT
working-day Phase 1 build
Custom PlatformWeb & MobilePaymentsMarketplace Platform
01

The Challenge

Globlyzone combines the model of a services directory, a ride-hailing app, a food-delivery app, and an e-commerce marketplace into one platform that owns no inventory or vehicles. The brief: unify very different transaction types — bookings, rides, and food orders — under one automatic commission engine, support four distinct roles (consumer, provider, driver, admin), tie a tiered subscription to search ranking, and launch a web MVP fast before mirroring it into native apps.

02

What We Built

Phase 1 was scoped to two modules: Services & Seekers, and Transportation & Delivery. Stripe and Stripe Connect handle escrow-based payments with automatic 80/20 splits (and a 70/20/10 split for food delivery). Providers onboard in eight steps, drivers go through Checkr background checks, and Google Maps, Twilio SMS drop-off codes, and WebSocket channels keep every party in sync. Contact-info sharing is auto-detected and blocked, and reviews are locked to verified bookings.

Next.js 14Laravel 13Stripe ConnectGoogle MapsTwilioCheckrRole-Based Access
SERVICES USEDProduct Design, Full-Stack Development, Stripe Connect Payments
03

The Result

The public site, provider and consumer dashboards, the five-tier subscription and pricing page, and the core booking and payment flows are built and iterating on a shared staging environment. The admin dashboard and moderation tools are in progress, and further verticals are roadmapped beyond Phase 1.

Globlyzone

See it live.

How This Project Came Together

  1. 01
    Foundation, CI/CD & design kickoff
    Week 1
  2. 02
    Module 1 APIs & wireframes
    Weeks 2–3
  3. 03
    Frontend & Module 2
    Weeks 4–5
  4. 04
    Integration, QA & staging
    Days 26–45

More Results Like This

Want something like this for your business?

Get in touch

Want Results Like This?

Tell us what's holding growth back. If we're the right fit, we'll say so.